|
Data
|
|
Data
The various observational time periods at the
Ilorin site are numbered as "setups" for easy identification and processing
purposes. The table below depicts the parameters that are measured at the
site during each setup.
Setup
|
Date
|
Parameters
Measured
|
1
|
Oct 1992
- May 1995
|
PRG, SWG,
LWD, BODY and DOME
|
2
|
June 1995-
Oct 1998
|
TAIR, RELH,
PRESS, SWG, PRG, PRD, LWD, BODY, DOME, RAIN and BATT
|
3
|
November
1998- August 1999
|
TAIR, RELH,
PRESS, SWG, SWD, PRG, PRD, LWD, BODY, DOME, RAIN and BATT
|
4
|
September
1999 - present
|
TAIR, RELH,
PRESS, SWG, SWD, PRG, PRD, LWD, BODY, DOME, RAIN and BATT |
The data from this project are archived at various
locations and places of distribution. The table below lists the location
of each archive, and the duration of data that were archived there.
Location
|
1992-1994
|
1995- Oct
1998
|
Nov 1998-
Jun 1999
|
Aug 1999-
Present
|
University
of Ilorin, Ilorin, Nigeria
|
×
|
×
|
×
|
×
|
NASA Langley
CERES archive
|
×
|
×
|
×
|
×1 |
University
of Maryland, College Park, MD
|
×
|
×
|
×
|
×
|
World Radiation
Monitoring Centre (WRMC), the Eidgenossische Technische Hochschule (ETH),
Zurich, Switzerland
|
×2 |
×2 |
|
|
× - availability
1 - partial record
2 - data are in formats required
by the BSRN protocols
To access the data click here
Maintained by Chuan Li
|